The 3 in 1 CombiBlock Machine allowed us to consolidate our entire bottling line into one machine, reducing labor costs and increasing output. The after-sales support has been outstanding!"
Emily WrightCEO, FreshJuice Co


This linear bottle water blowing filling capping 3 in 1 machine line is specifically designed for small mineral water plants, offering customizable options for small-batch, multi-specification production. Length less than 7 meters,Small workshops are no longer an issue.

This is a fully automatic high-speed beverage production line that composed of a rotary blowing -filling-capping combi block machine. It is mainly used to produce bottled drinking water, juice drinks, etc. it can help you greatly improve the production of mineral water /juice /beverages.

Combine bottle blowing, filling, and capping into one seamless system, reducing the need for multiple machines.
With advanced heating and power management, our system reduces energy consumption, helping lower operational costs.
The integrated design minimizes manual intervention, significantly reducing labor costs and increasing productivity.
From beverage production to industrial bottling, FAYGO UNION’s 3-in-1 water bottling line is used by manufacturers worldwide to streamline their bottling processes and increase efficiency.









FAYGO UNION’s 3-in-1 bottled water manufacturing machine automates the entire bottling process, from bottle blowing to capping, ensuring maximum productivity with minimal labor.
Our machines are designed to be energy-efficient, helping you save on energy costs while producing at a high capacity.
Each stage of the process is controlled with precision, ensuring uniformity in every bottle and reducing the risk of defects.

Discover what our clients have to sya
Our system can produce and fill a wide range of bottle shapes and sizes, from small beverage bottles to larger industrial containers.
Our machine is designed with energy-saving components, reducing power consumption by up to 30%, helping you lower operational costs.
Installation typically takes 2 to 4 weeks, depending on your production setup. We also provide full training to ensure smooth operation.
We offer 24/7 online support, fast spare parts delivery, and local representatives for on-site service, ensuring minimal downtime.